Getting to the bottom of things

At the end of last week we were quite pleased having dug nine three-foot deep holes and concreted in the ground posts for one side of the polytunnel.  So this week the other side should follow in the same way… Except that the slight slope of the land proved to equal a nine inch increase in height, ie a nine inch increase in the depth of holes.  It was hard getting to the bottom of it:

2015_09_21_03

Other bottoms today:

2015_09_21_12
2015_09_21_13

Here is advice about underweight autumn hedgehogs:

hoglet

But not much point in us ringing 01584 890 891, we have to do it ourselves… maybe with a small sigh as hoglet number 15 stumbles across our path tonight.  The spare room is FULL.

Pethan eraill yn y tyddyn heddiw:

2015_09_21_01
2015_09_21_04
2015_09_21_05
2015_09_21_06
2015_09_21_07
2015_09_21_08
2015_09_21_09
2015_09_21_10
2015_09_21_11
2015_09_21_14
2015_09_21_15
2015_09_21_172015_09_21_18
2015_09_21_19
2015_09_21_20
2015_09_21_21
2015_09_21_22